108枚の写真
Cat DP100 19420 lb Pneumatic Tire フォークリフト
所在地
South Vienna, OH
South Vienna, OH
使用状況
9,407 時間
9,407 時間
シリアル番号
3DP00328
3DP00328
Cat DP100 19420 lb Pneumatic Tire フォークリフト
South Vienna, OH
機械の詳細情報
Ritchie Bros.の資格を持つ従業員が機械の詳細情報を収集し、主要コンポーネントの機能テストを行いました。オークション当日に入札を行う前に、会場にてお客様、あるいは代理の方がアイテムを検査することも可能です。
ID番号
#16194945
ヤード内
いいえ
機能
Enclosed Cab, 2 Stage Mast, 219 in Max Lift Height, 168 in Lowered Mast Height, 108 in Forks, Side Shift, Fork Positioner, 2001 US EPA Label, Mitsubishi 6D16 EA 6 Cylinder 7.545 L Diesel Engine
General Appearance
(24)























Serial Number / VIN
3DP00328
Hour Meter / Odometer
9407 hrs-No guarantees made as to actual hours/miles/kilometers; the inspection report reflects what can be visually observed.
Paint
Glass
Exterior Lights
Some not operational, Front left cab and right rear tail lights are not operational
Safety
(1)
Travel Alarm
Operational
Horn
Operational
Seat Belts
Operational
Current Safety Manual
Current Operator/Maintenance Manual
Control Station
(12)











Mirrors
Seats/Armrests
Hydraulic Controls
Loose
Steering Control
Drivetrain Controls
Oil Pressure
The fault indicator shuts off after the engine oil pressure rises.
Warning Lights
Operational
Gauges
Operational
Limited Function Check
The main components are in place and operational as noted.
Engine
(12)











Emissions Status
Other 2001 US EPA Label
Emission Label
Blow-by (subjective visual observation)
Visible
Starter
Operational
Exhaust System
Radiator
Low coolant level
Oil Leaks
No dripping leaks
Fuel Leaks
No dripping leaks
Cooling System Leaks
No dripping leaks
Engine - Left Side
Engine - Right Side
Limited Function Check
The engine started and ran.
Drivetrain
(7)






Transmission
Operational
Inching Brake
Operational
Front Drive Axle
Final Drives
Limited Function Check
The drivetrain was operational.
Hydraulics
(15)














Pumps (Hydraulics)
Valves
Hydraulic Tank
Hoses (Hydraulics)
Residue
Steering Cylinders
Movement
Mast Lift Cylinders
Mast Tilt Cylinders
Side Shift Cylinder
Heavy pin and bushing movement
Fork Positioning Cylinder (on fork carriage)
Heavy pin and bushing movement
Limited Function Check
The hydraulic system was operational.
Chassis Lift
(37)




































Mast/Boom Condition
Heavy wear
Chain / Tensioners
Heavy wear
Carriage Rollers and Guides
Heavy wear
Load Back Rest
Side Shift
Forks
Bent, Damaged tips
Steering Linkage
Frame Condition
Master Cylinder/Brake Control
Park Brake
Weak
Limited Function Check - Brakes
The brake system functioned, stopping and holding the machine.
Left Front Tire
Left Rear Tire
Right Rear Tire
Right Front Tire
Wheel Condition
Lugs
Oil Sample Analysis
Oil Sample Analysis
| engine | transmission | |
|---|---|---|
| date of analysis | Jul 06, 2026 | Jul 06, 2026 |
| Silicon | 0 PPM | 0 PPM |
| Tin | 2.98 PPM | 0.53 PPM |
| Silver | 0 PPM | 0.15 PPM |
| Aluminum | 0 PPM | 3.88 PPM |
| Chromium | 4.29 PPM | 1.13 PPM |
| Lead | 2.06 PPM | 2.89 PPM |
| Copper | 0.44 PPM | 838.13 PPM |
| Nickel | 0.19 PPM | 5.02 PPM |
| Iron | 3.36 PPM | 280.59 PPM |
| Glycol | NEG | N/A |
| Water | NEG | N/A |
| Fuel | <5% | N/A |
その他の情報
配送と受け取り
- お支払いが(税金・管理手数料を含む)全額完了するまで、購入されたアイテムをオークション会場から搬出することはできません。
- ドライバーは、アイテムを受け取る際に、Ritchie Bros. Auctioneersリリースチケットのコピーを携行する必要があります。
- お客様が最低価格で最良の運送業者を簡単に手配できるよう、弊社はVeriTreadと提携しています。無料見積もりを依頼するか、VeriTreadから直接即時の配送見積もりをお取りください。
配送料金推定ツール
弊社はVeriTreadと提携し、最低価格で最良の運送業者をご紹介しています。オークション会場への、または会場からの機械の輸送について、迅速で無料の競争力のある見積もりを今すぐお取りください。不要な電話や義務は一切ありません
一般事項
機械の詳細情報は範囲に制限があり、Ritchie Bros. Auctioneersは、ここに明記するもの以外の設備やコンポーメントの検査は行っていません。特に明記されていない限り、明示的または黙示的かにかかわらず、Ritchie Bros.は機械やそのコンポーネントに関する一切の責任を負わないものとします。機能性、快適性、あるいは関係官庁や規制機関が定める安全基準や要件に関する準拠性、特定目的への適合性、または商品性に関する表明や保証も含まれますが、これらに限るわけではありません。お客様には入札される前に必ず機械の検品を行うことをお勧めします。
機能
機械は負荷の下でのテスト、または利用可能なすべてのギアを使用してのテストを行ったわけではありません。機械が、メーカーの仕様に従って動作されていたか保証はできません。ここで公開されている以外の機能性テストは実施されていません。個々のアンダーキャリッジコンポーネントについては選択中の写真のみが提供されています。このため、アンダーキャリッジ全体の状態を示さないことがあります。
寸法
寸法は、あくまで参考として表示されています。実際に積載された状態での寸法は、トラックやトレーラーの高さ、積載された機械の構成や位置により異なります。オークションの会場から搬出する前に、すべての積載物が運搬可能な状態になっているかの確認は、バイヤーの責任になります。全寸法は、お客様によって採寸・確認を行うようお願いします。運搬に際して、これらの寸法はあくまで参考としてお使いください。



